[Construction Example] Slab Foundation House: Settlement Repair Work (Kyoto Prefecture)

Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.

We would like to introduce a case of "settlement correction work" carried out on a slab foundation house located in Kyoto Prefecture. This is a construction case of a house that had sunk due to ground subsidence, resulting in distorted door frames and gaps. We corrected a slab foundation house with a maximum settlement of 46mm in 2.5 days. 【Case Overview】 ■ Maximum Settlement: 46mm ■ Area: Kyoto Prefecture ■ Construction Period: 2.5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work Due to Earthquake (Ibaraki Prefecture)

A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.

We would like to introduce a case of "settlement correction work" carried out on a flat foundation house located in Ibaraki Prefecture. The house was newly built and experienced a maximum settlement of 500mm due to the Great East Japan Earthquake. Due to the significant tilt, we used a combination of the up-con method and the single pipe pile driving method for the correction. 【Case Overview】 ■ Maximum Settlement: 500mm ■ Area: Ibaraki Prefecture ■ Construction Period: 10 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Slab Foundation House: Settlement Correction Work Due to Liquefaction - Site Tour

A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.

We would like to introduce a case of "settlement correction work" carried out on a slab foundation house located in Urayasu City, Chiba Prefecture. The house sank due to the impact of the Great East Japan Earthquake. The maximum settlement of approximately 60mm was corrected in 1.5 days. Additionally, there were many requests to visit our construction site, so with the kindness of our customers, we held an open house at this site. Many people were able to visit and observe the work. 【Case Overview】 ■ Maximum Settlement: Approximately 60mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 1.5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Kawasaki City, Kanagawa Prefecture)

Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Kawasaki City, Kanagawa Prefecture. The homeowner, who purchased the house as a pre-built property, was deprived of a comfortable living environment due to the tilting of the house caused by ground subsidence. Several methods for settlement repair were considered, but the homeowner chose our company for the quick and non-disruptive repair without having to move. 【Case Overview】 ■ Maximum settlement amount: 107mm ■ Area: Kawasaki City, Kanagawa Prefecture ■ Construction period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tokyo)

No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Hachioji City, Tokyo. Due to a maximum settlement of 95mm observed, polyurethane resin was injected under the slab foundation to implement the settlement correction. If you are troubled by the tilting of your slab foundation house caused by earthquakes, liquefaction, or ground subsidence, please feel free to contact us. 【Case Overview】 ■ Construction Area: Approximately 43m2 ■ Maximum Settlement Amount: 95mm ■ Area: Hachioji City, Tokyo ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Factory

Solving your factory problems! Introducing "TerraTech" case studies for subsidence correction and void filling.

We would like to introduce a case where problems caused by subsidence and voids in a factory were resolved by Teratech. [Problem] In a steel processing factory located in Ibaraki Prefecture, the concrete floor sank by about 3.4 cm. Although the factory had not been in operation for long, subsidence occurred, causing issues with the laser processing machine purchased for steel processing, which could no longer operate according to the specifications. For precision machines like laser processing machines, having a level floor is crucial for normal operation. [Reasons for Choosing Teratech] - Work can be carried out without stopping operations. - The work can be completed in a short time. [Feedback After Construction] "We were planning to readjust the level of the laser processing machine after this construction, but the floor correction was done so well beyond our expectations that the processing machine is now operating normally. We were very relieved that the planned budget of 1 million yen for the laser level adjustment was no longer necessary," we received words of gratitude. In addition, we also introduce resolution cases from packaging material manufacturing factories. *For more details, please refer to the external link page or feel free to contact us.

  • factory-02.jpg
  • factory-03.jpg
  • factory-04.jpg
  • factory-05.jpg
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Report: Hospital

Solving your concerns at the hospital! Introducing case studies of "Mainmark" for subsidence correction and void filling.

We would like to introduce a case that solved issues related to subsidence and cavities in a hospital. [Issues] A certain neurology clinic located in Sendai City was leaning, but as it is a comprehensive clinic equipped with both outpatient services and inpatient facilities, it operated almost 24 hours a day, 365 days a year. We received a request to carry out the construction without affecting the hospital's operations. [Feedback after Construction] Although it was a large-scale project, we successfully resolved the floor sagging and building subsidence in just two days of construction. The clinic resumed normal operations after the holiday, and the client was very satisfied. [Case Overview] ■ Comprehensive Clinic - Construction Details: Floor sagging and subsidence correction work - Construction Date: November 2013 - Location: Miyagi Prefecture - Construction Area: 900m² Other cases are also introduced on the following page: https://teretek.jp/plus/case/hospital *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Office/Parts Storage: Settlement Correction Work

No interruption in operations, correction of subsidence! Introducing a case where the floor level was adjusted and the gaps in the walls were improved.

We would like to introduce a case of "settlement correction work" carried out at the office and parts warehouse of an automobile manufacturer located in Hokkaido. In this company, the building had tilted due to settlement, causing issues with the opening and closing of doors and creating gaps in the ceiling. Therefore, the Upcon method was adopted because it could be implemented without stopping operations and within a short construction period. After the work was completed, the floor levels throughout the office and parts warehouse were corrected, and the gaps in the walls that had existed before the construction were also improved. 【Case Overview】 ■ Construction Area: 345m2 ■ Maximum Settlement: 63mm ■ Maximum Gap: 70mm ■ Area: Office of an automobile manufacturer located in Hokkaido ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Earthquake-Induced Settlement Repair Work (Miyagi Prefecture)

Addressing the sinking of slab foundation houses due to earthquakes in a short construction period! A case where all areas were corrected to within -10mm.

We would like to introduce a case of "settlement correction work" for a slab foundation house located in Sendai City, Miyagi Prefecture. Due to the impact of an earthquake, there was significant settlement from the bedroom towards the entrance. Cracks and gaps appeared in the columns and stairs of the entrance porch. All points, including a maximum settlement of 73mm, were corrected to within -10mm. 【Case Overview】 ■ Construction Area: Approximately 80m² ■ Construction Period: 2 days ■ Maximum Settlement Amount: 73mm *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work Due to Earthquakes and Liquefaction

Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Urayasu City, Chiba Prefecture. The slab foundation house experienced settlement due to liquefaction caused by the Great East Japan Earthquake. Living in a tilted house also led to health issues such as poor physical condition. We corrected a maximum settlement of approximately 80mm over two days. 【Case Overview】 ■ Maximum Settlement: 80mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Gifu Prefecture)

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

We would like to introduce a case of "settlement correction work" carried out at a certain house with a flat foundation in Gifu Prefecture. There was a request to perform settlement correction before the exterior wall work, and we were contacted by the client. We injected resin under the flat foundation to correct the settlement, completing the work in two days. 【Case Overview】 ■ Construction Area: Approximately 36m² ■ Maximum Settlement Amount: 48mm ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work

The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.

We would like to introduce a video of the correction of the sinking floor in the gymnasium of an elementary school located in Miyagi Prefecture. The floor of the gymnasium has significantly sunk due to earthquakes and ground subsidence. This video explains the construction process of the Upcon method used in the gymnasium. The construction area is 665m2, and the construction period is 6 days. Please take a look. 【Site Information】 ■ Construction Area: 665m2 ■ Construction Period: 6 days ■ Maximum Sinking Amount: 133 ■ Maximum Void Amount: 90mm ■ Area: Miyagi Prefecture *For more detailed information, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Elementary School (Classroom): Settlement Correction Work

Concerns about children's safety and health! A case of correcting floor sagging in the classroom within a short construction period.

We would like to introduce a case where we performed "subsidence correction work" in an elementary school classroom in Miyagi Prefecture. In this classroom, floor sagging occurred due to ground subsidence, raising concerns about the safety and health of the children. We raised the floor using the foaming pressure of polyurethane resin, correcting the maximum subsidence from -112mm to the planned value of -22mm. [Case Overview] ■ Construction Area: 1406m2 ■ Maximum Subsidence: 112mm ■ Construction Period: 6 days ■ Area: Miyagi Prefecture *For more details about the case, you can view it through the related links. For more information, please refer to the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction and pile extraction work

In case of any ground issues, we will solve them. "The house is leaning" "I want to remove the piles."

In the event of any differential settlement, we will serve as a consultation point and support you until the issue is resolved. We also provide guarantees after settlement correction. Additionally, we accept orders for the extraction of existing piles.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration